New Construction

        While every custom built pool is different, the design and building process generally remains the same. Here’s what you can expect after you contact Vacation Pools:

 1.                  One of our expert designers will visit you at your home.
We’ll gather information about what you want to accomplish: the way you want your outdoor living space to look like; how the pool will be used, etc. Then we’ll measure the yard, consider the location for sunlight and usability, and make sure that you understand all of the available options. In this initial consultation, we listen carefully so that we can seamlessly incorporate your dreams and your vision into an elegant and functional backyard oasis.

2.                  Within a few weeks, your custom design will be completed and ready for review.
You’ll also be able to discuss and decide on further options, details, and features.

3.                  Getting the permit.
Once you decide to move forward, we can immediately begin to schedule the building phase of your new pool by beginning with the permitting process.

4.                  We will begin to engineer your custom pool with meticulous detail.
We will start by grading and excavating, or digging out the site. We’ll also perform any necessary demolition during this phase. After the site has been excavated, we will install the reinforcing steel, or rebar. Then all of the plumbing and electrical work will be completed before the pool goes through an initial inspection.

5.                  Your pool will be sprayed with a concrete-like substance known as gunite.
This usually takes between one and two weeks to cure, or dry. After the gunite has cured, we will install the coping and tile.

6.                  We will complete all of the masonry work.
If you have chosen to include features like custom walls, rock features, waterfalls, a barbeque or a fireplace, they will be built or installed during this phase of construction.

7.                  The deck of your pool will be installed.
It usually takes two weeks to prepare the deck and one week to install the decking. Then your pool will go through another inspection. Any options such as gates, fences, or alarms will also be installed here.

8.                  Finally, your pool will be plastered.
This is one of the last phases of construction. It will usually only take one day to plaster your pool.

9.                  Fill your new pool with water
When the plaster phase is complete, your pool will finally be ready to be filled with water.

10.             Have fun!
This is just the beginning of your own backyard vacation...

 

 

  Vacation Pools, Inc. area:

Desert Cities

Riverside County

San Bernardino County

Orange County

Los Angeles County

Blythe Arlington Alta Loma Aliso Viejo Claremont
Cathedral City Banning Bloomington Anaheim Covina
Coachella Beaumont Chino Anaheim Hills Diamond Bar
Desert Hot Springs Calimesa Chino Hills Brea Glendora
Indian Wells Canyon Lake Colton Corona Del Mar La Mirada
Indio Cherry Valley Cucamonga Costa Mesa La Verne
Joshua Tree Colton Fontana Fullerton Norwalk
La Quinta Corona Highland Huntington Beach Phillips Ranch
Mecca Grand Terrace Loma Linda Irvine Pomona
Morongo Hemet Montclair Ladera Ranch  San Dimas
North Palm Springs Jurupa Ontario Laguna Hills Walnut 
Palm Desert La Sierra Rancho Cucamonga Lake Forest  
Palm Springs Lake Elsinore Redlands Mission Viejo  
Pioneertown Menifee Rialto Newport Beach  
Rancho Mirage Mira Loma San Bernardino Orange  
Sky Valley Moreno Valley Upland Placentia  
Thermal Murrieta  Yucaipa Rancho Santa Margarita  
Thousand Palms Norco   Santa Ana  
Twentynine Palms Pedley   Santa Ana Hills  
Yucca Valley Perris   Santa Margarita  
  Riverside   Tustin  
  San Jacinto   Yorba Linda  
  Temecula      
  Winchester      
         
         
         
 

            
 Visit us on Facebook!  Bookmark and Share